What is modeled — and what is not
Production
1,310 kWh/kW-year state planning benchmark from the existing PVWatts-based CalcuRiver dataset.
Installed cost
$3.00/W planning benchmark for Massachusetts.
Electricity value ceiling
30.49¢/kWh · EIA residential benchmark for Massachusetts (2026-07).
Eversource MA rate context
35.69¢/kWh · R-1 default service · Greater Boston. This is utility rate-plan context, not a verified solar export-compensation rate.
Utility source: Current official utility/regulator rate source · verified 2026-09-28.
Production: NREL PVWatts methodology · Cost: 2026 state / local marketplace benchmark.
Solar export source: Eversource Massachusetts Net Metering · Eversource Massachusetts Net Metering FAQ · verified 2026-10-03.
Why exact Eversource Massachusetts solar savings still require customer-specific billing inputs
Exact Eversource Massachusetts solar savings require the facility class and applicable net-metering credit calculation. CalcuRiver keeps the export result guarded rather than applying the state retail benchmark as a universal export rate.
Continue this Massachusetts cost analysis
City solar pages in this utility context
Why this solar estimate changes
Solar value is driven by local production, installed cost, the retail value of electricity you avoid buying, and the compensation you receive for exported energy. CalcuRiver does not assume export credits equal the retail rate unless that utility program is explicitly verified.
Core logic: self-used solar offsets retail purchases; exported solar is valued only under a verified export-compensation rule.
Methodology & source policyConnect solar to the rest of the utility bill
Solar economics are easier to interpret when the tariff, storage and vehicle loads are connected to the same local context.
Utility tariff profile
Review the source tariff and verification status behind local electricity economics.
EV charging costs
Compare transportation electricity costs in the same state.
Battery + TOU economics
See whether storage changes self-consumption and time-of-use economics for this utility.
EV charger installation
Estimate Level 2 charger electrical work in the same state.